Search
Close this search box.

A&R orders ABB equipment for new superyacht

Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

RelatedArticles

In Ancona, at the Ferretti Group Superyacht Yard, the new aluminium yacht “Amor à Vida”...

The Slovenian company GX Superyachts has taken another significant step towards delivering its first GX42...

The 55m steel yacht YN 20655 was recently launched at Heesen and has been named...

Meros Netyachts is set to unveil its new concept at Boot 2025 in Düsseldorf: the...

Silent Yachts, the catamaran builder specializing in solar-electric yachts, is anticipating an exceptionally busy 2025,...

Lehmann Marine has signed an investment agreement with the Sunlight Group, under which the Greek...

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB