Search
Close this search box.

A&R orders ABB equipment for new superyacht

Tesvolt
Anschuetz
Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

Jastram
GL

RelatedArticles

ISA Yachts – a part of Palumbo Superyachts – presents the new 45-metre Voyager model....

This hybrid construction of “Anjelif” is the result of the experience Columbus Yachts has gained...

IGY Marinas has been appointed as the manager of the Sindalah Yacht Club, situated at...

Sunreef Yachts has launched a new strategic partnership with Brabus, a specialist in customization and...

After more than 30 years at the Kiel-based company Anschütz, Sven Dreyer moved to Furuno...

The “Jagare” was built in 1981 at the Abeking & Rasmussen (A&R) shipyard and has...

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB