A&R orders ABB equipment for new superyacht

Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

Schaffran

RelatedArticles

The Lürssen shipyard is currently sea trialling a new flagship project: the superyacht “O3”, better...

Zeelander Yachts has entered 2026 with the sale of two Zeelander 5 yachts in January....

With the Manari 52, the new Miami-based brand Manari Yachts has introduced its first model....

The German shipyard YYachts has started construction of its first Y8 equipped with a hybrid...

The Dutch Balk Shipyard has appointed Rick Thomas as its U.S. Sales Representative, effective immediately....

Feadship Resale has announced the successful sale of the 55.20-metre motor yacht “Somnium”. Feadship Resale...

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB