Search
Close this search box.

A&R orders ABB equipment for new superyacht

Tesvolt
Anschuetz
Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

Jastram
GL

RelatedArticles

The Dutch yacht builder Heesen Yachts has introduced its new project YN 20955, code-named “Agnetha”....

The Monaco Yacht Show takes place from 25 to 28 September. The new sailing yacht...

Teak has a long-standing tradition in the yacht industry. However, more and more alternatives are...

Sanlorenzo Timeless, the after-sale service of the Italian yacht builder, has chosen HP Watermakers desalinators...

The Dutch company Damen Yachting has announced that another Amels 60 has entered the outfitting...

The Accor hotel group is reviving a legend: the Orient Express. Not on the railway,...

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB