A&R orders ABB equipment for new superyacht

Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

Schaffran

RelatedArticles

Lürssen has opened a service centre at Port Tarraco in Tarragona, Spain. The facility includes...

ISA Yachts has unveiled the GTO 70ft, a new motor yacht measuring around 22 m....

Turkish yacht builder Sirena Yachts has appointed Yachts360 as its new exclusive dealer for series-production...

Cantiere del Pardo presented the first Grand Soleil 60 at the Cannes Yachting Festival 2026....

Galeon Yachts unveiled the new 570 SKY at the Fort Lauderdale International Boat Show. The...

Turkish yacht builder Numarine has opened a new office in Fort Lauderdale and changed its...

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB