Search
Close this search box.

A&R orders ABB equipment for new superyacht

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

RelatedArticles

The 40th edition of the Palma International Boat Show (PIBS) took place in Palma de...

Yacht builder Heesen has handed over the "Cinderella Noel IV" to the owner. Prior to...

METSTRADE has announced the establishment of the Superyacht Content Board, aimed at fostering stronger ties...

The third unit of the new Mangusta 165 REV series was launched in Viareggio recently....

Ocean Independence announces that it has sold eight yachts on three continents in just over...

With effect from 1 June, Benetti has appointed Daniela Petrozzi as its new Sales Director....

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB