A&R orders ABB equipment for new superyacht

Schaffran
Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

RelatedArticles

Seattle-based shipyard Delta Marine is nearing completion of a new 110-foot yacht—one of six custom...

Benetti has launched “FB287”, a 67-metre steel-hulled superyacht from its B.Now series, equipped with the...

Nauta has unveiled its latest design for Kiboko 4, the second unit in Southern Wind’s...

The yacht consultancy and brokerage firm Revolution Marine Group (RMG) has opened new offices in...

After a refit at the Damen Yachting shipyard in Vlissingen, the Amels “Albatros” was renamed....

Heesen Yachts has announced the delivery of the 55-metre steel superyacht YN 20655, christened “Solemates”....

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB