A&R orders ABB equipment for new superyacht

Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

RelatedArticles

The bankrupt shipyard Nobiskrug and its sister company Flensburger Schiffbaugesellschaft (FSG) are moving forward. An...

The Istanbul-based Bilgin shipyard has recently launched its newest yacht, “Camila”. It is the latest...

The first unit of Columbus Yachts’ Atlantique 47 has been launched and named “Acqua Chiara.”...

The Hamburg-based company Jastram is expanding its global service network with the new partner AMS...

Built by Sunreef Yachts Founder and President Francis Lapp, the catamaran “Marie-Joseph” is now available...

The Turkish shipyard Numarine is focused on reducing noise aboard its yachts. Their latest explorer...

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB