A&R orders ABB equipment for new superyacht

Schaffran
Schaffran

To save fuel, emissions and energy, a new superyacht being built by the Abeking & Rasmussen shipyard will be equipped with ABB solutions[ds_preview].

The shipyard has awarded ABB the contract to supply power and propulsion systems for the superyacht. The ship, which is over 100 meters long and is due to be handed over to the owner in 2025, will be one of the largest ever built at the A&R shipyard in Lemwerder. The ABB systems on board will include the Azipod propulsion system, the onboard DC grid, a 500 kWh energy storage system (ESS) and a power and energy management system (PEMS), whose combined and fully integrated functions will reduce emissions, noise and vibrations. The entire system can be integrated with remote diagnostic services and 24/7 support.

The increased efficiency achieved by the Onboard DC Grid™ and Azipod® drives is expected to increase the yacht’s range and help reduce fuel consumption and emissions. At the same time, the energy storage and management system will optimize power consumption and increase operational flexibility through peak shaving, according to ABB.

RelatedArticles

The Water Revolution Foundation has announced the appointment of Aino-Leena Grapin as Chair of the...

At the Damen Yachting shipyard in Vlissingen, another 80-metre Amels Limited Editions yacht has arrived...

Over the weekend, the Lürssen shipyard celebrated its 150th anniversary. Right on time for the...

Denison Yachting announces that the fourth hull in the Conrad C144S series is available for...

Leer-based shipping company Briese is entering into a strategic partnership with Peters & May, a...

Almost exactly two years after the steel hull for the 134-metre megayacht, known under the...

HANSAYACHTSNewsletter

Subscribe to the monthly HANSA Yachts Newsletter below and get an overview of the most important news directly to your inbox:

Caption: ABB